Work commenced on the maintenace of our club pitch over the weekend.
The project being undertaken is to place correct drainage around both goalmouth to 20 metre line areas, place astro turf in the goal mouths and resod the remaining area.
Post the completion of the work the full pitch will be unuseable for a period of time. The exact mount of time is unknown. Please bear with us for this period.
Some pictures below of the start of the work.
{gallery}PitchMaintenance2016{/gallery}